1
Tracks every job through six gates: job review, material, tooling and fixtures, program and setup, first article, and release.
Free Excel template
Move every new job through six gates, from job review to released to production, each with a clear done-when.
What it does
Tracks every job through six gates: job review, material, tooling and fixtures, program and setup, first article, and release.
Shows each job's current gate, next action, owner and projected finish against the due date.
Pulls every on-hold or overdue task into one blocker list, so half-ready jobs stay off the floor.
Why it matters
A job released before it's ready doesn't start early. It stalls on the machine, gets pulled for a hot job and comes back later with a new setup. Gating the release keeps the floor working on jobs that can actually ship.
What's inside
Free download
Free Excel workbook. Downloads right after you sign up.